
06
Illustrative project
Logistics centre utility water
A pre-piped duplex skid supplying washdown and utility water.
Sector
Building Services
Location
North America (illustrative)
m³/h duty / standby
2 × 120
packaged skid
1
01
Scope
What was supplied
Illustrative project for demonstration. Not a real customer or outcome.
PS-2 duplex pump skid delivered pre-tested.
Swing-check valves on each pump discharge.
Pressure gauge and isolation on the common manifold.
Tell us the duty point and we will propose the equipment.
Send flow, head or pressure class, fluid and temperature. A demonstration form: connect your own destination before launch.

