var(--variable-SbTW_fS6x)

06

Illustrative project

Municipal booster station upgrade

Replacement of fixed-speed boosters with a three-pump cascade set feeding a residential network.

Sector

Water & Wastewater

Location

Northern Europe (illustrative)

m³/h boosting capacity

3 × 60

duty / standby operation

24/7

01

Scope

What was supplied

Illustrative project for demonstration. Not a real customer or outcome.

  • Survey of the existing station and the daily demand profile.

  • BS-3 booster set with isolation and non-return valves on each pump.

  • Y-strainers upstream of the set to protect the pumps.

Tell us the duty point and we will propose the equipment.

Send flow, head or pressure class, fluid and temperature. A demonstration form: connect your own destination before launch.

Create a free website with Framer, the website builder loved by startups, designers and agencies.